          It is best to install street light with solar power with installation personnel with construction experience, and select the appropriate cement in strict accordance with the street light with solar power foundation map. In areas with high soil pH, special cements resistant to acid and alkali must be used; fine sand and stones should not contain any impurities such as soil that affect the strength of the concrete; strictly follow the size of the street light with solar power foundation (the installation size is determined by the installer) and the excavation along the road Pit; Place the pit for 1 to 2 days after excavation to prevent groundwater seepage. A 5×Ф80 drain hole must be added to the bottom of the battery compartment in the foundation of the street light with solar power or according to the drawings. In the foundation, the upper surface of the buried cage must be level (measured and tested with a level). The anchor bolts in the cage must be perpendicular to the upper surface of the foundation (measured and tested with a square rule); before installation, the threaded pipe is The end must be blocked to avoid foreign matter entering or clogging during installation or after installation, resulting in difficulty in threading or threading during installation; the soil around the foundation must be compacted; the street light solar led foundation needs to be cured for 2 to 7 days (specific time) It can also be determined according to the weather conditions; the installation of street light solar led can be carried out after the street light solar led foundation experience is passed.

 

solar led street light kit        

            The installer must be familiar with the installed street light solar led structure, select the safe and close to the installation site for solar led street light kit assembly; remove the package and check the parts and accessories according to the configuration list and check whether it is scratched, deformed, etc. during transportation. The solar led street light kit pole assembly and the wear-resistant accessories (such as solar battery components, lamp holders, etc.) are preferably placed with a soft pad to prevent unnecessary damage such as scratches during installation.  

 

< >
Latest posts
Technical Support: Magic Lamp